
Hydrogen for heat treatment
Hydrogen for annealing
Hydrogen for brazing
Hydrogen for sintering
01 · Production
02 · Plant management
03 · Purchasing

Customer story · Furnace brazing
Before
The decision
By 2023
What determines the right system
Gas quality
What determines the right system
Gas quality
What determines the right system
Gas quality
| Series | Model | Nm³/h | SCF/h |
|---|---|---|---|
| S Series | S10 | 0.27 | 10 |
| S20 | 0.53 | 20 | |
| S40 | 1.05 | 40 | |
| H Series | H2 | 2 | 76 |
| H4 | 4 | 152 | |
| H6 | 6 | 228 | |
| C Series | C10 | 10 | 380 |
| C20 | 20 | 760 | |
| C30 | 30 | 1,140 |
Nominal model outputs. Nm³/h at 0°C and 1 bar; SCF/h at 70°F and 1 atm, as stated on the datasheets. Selection also depends on demand peaks, operating conditions and the complete supply arrangement.
No. Start with what you have: approximate consumption, cylinders used per week, operating hours or your current supply arrangement. We can discuss what additional information is needed for sizing.
A generator supplies hydrogen. Blending, distribution and furnace-atmosphere control remain part of the wider process system. Compatibility with your existing arrangement needs to be reviewed.
The selected model determines the requirements. These include electrical power, suitable deionised water, space, ventilation and gas connections. H and C Series also require liquid cooling. Review the relevant datasheet and installation requirements as part of the assessment.
Yes, within the system’s rated output. S, H and C Series generators follow demand automatically, adjusting from zero to full production as your furnace draws hydrogen. Peaks above rated output are addressed in sizing and the overall supply arrangement, which Nel designs with you.
Backup and maintenance arrangements depend on your production requirements and the proposed system. Discuss these as part of the supply assessment before changing your existing arrangement.
Consider actual consumption, delivered-gas charges and contract terms alongside equipment, installation, electricity, water, cooling and maintenance costs. The useful comparison is specific to your plant and operating pattern.
Use the requirements of your material and furnace process, including relevant impurity and moisture limits. Share any purity or dew-point specification you already use, together with its measurement conditions if known.
After the first conversation, you should know