How On-Site Gas Generation Supports the Integration of Sintering Facilities into MIM and Sinter-Based AM Operations

Powder Injection Moulding magazine – September 2020

Metal Injection Moulding and industrial-scale sinter-based Additive Manufacturing facilities require a secure supply of industrial gases for use as sintering atmospheres. In addition to cost considerations, a strategic view needs to be taken of how these gases are supplied or generated, what infrastructure is required to store them, and what the risks are in terms of health & safety and supply stability. In this article, David Wolff, Stefan Joens, Bryan Sherman, Mike Montesi and John Boyle outline the challenges and the solutions.

Click read more then flip to page 103 of Powder Injection Moulding, September 2020 issue.